For one year now, Gebr. Tigges GmbH & Co. KG has been producing with its new moulding machine from HWS—and Managing Director Dr. Andreas Huppertz took this occasion to reach out to us with a message that we were very pleased to receive:
“The moulding plant that was installed in our facilities by a market competitor in 1982 had long shown significant deficiencies in mould technology. Particularly burdensome was a mould rejection rate of over 20 percent. This meant that more than every fifth mould produced was not usable and was lost to production.
With the conversion by Heinrich Wagner Sinto, we have consistently solved this problem. The project was implemented on both sides with high commitment and the utmost professionalism and was a complete success in every respect. All three central target criteria were fully met:
Criterion I: The very ambitious schedule from the outset was adhered to—made possible by three-shift work in the initial phase, which could be gradually reduced as the project progressed.
Criterion II: The mould rejection rate could be reduced from originally over 20 percent to today around 2 percent. The achieved process stability has been sustainably confirmed since commissioning.
Criterion III: The defined cost budget was maintained despite work on the existing system and despite unforeseen findings and uncertainties.
We thank Heinrich Wagner Sinto for the excellent collaboration and the noticeable improvement in our system performance.
The project impressively demonstrates the potential that lies in targeted modernisation of existing systems.”
Andreas Huppertz
Managing Director, Gebr. Tigges GmbH & Co. KG
We would like to extend our heartfelt thanks for the positive feedback and the trust placed in us. We look forward to continuing our collaboration with Tigges and are happy to assist with further optimisation of the moulding plant in the future.